Integrated Resource Plan IRP

NERSA consultation on the Ministerial Determinations – IRP and short term additional capacity

Ministerial Determinations – IRP and short term additional capacity

Signed by Minister 18 Feb, here are the determinations themselves (now on NERSA’s website, see below):

http://nersa.org.za/wp-content/uploads/2020/03/Consultation-Paper-1_Concurrence-with-Ministerial-Determinations.pdf

 

http://nersa.org.za/wp-content/uploads/2020/03/Consultation-Paper-2_Concurrence-with-Ministerial-Determinations.pdf

And here are NERSA’s consultation papers:

Comments by 14 April to Nersa on the new generation capacity to be procured from a range of energy source as set out in this consultation paper, based on the IRP

http://nersa.org.za/wp-content/uploads/2020/03/Consultation-Paper-1_Concurrence-with-Ministerial-Determinations.pdf

Comments by 7 May to Nersa on the new generation capacity to be procured from a range of energy source as set out in this consultation paper, to close the generation gap in the short and medium term

http://nersa.org.za/wp-content/uploads/2020/03/Consultation-Paper-2_Concurrence-with-Ministerial-Determinations.pdf

 